
Installation
Barrier installation.Supply & installation within 7 days.
Every barrier we supply is professionally installed. What happens between choosing your barrier and a working entrance: survey, order, groundwork, installation, commissioning and handover.
- Installation
- Within 7 daysOf placing your order
- Coverage
- Nationwide
From survey to handover
Barriers are specified from established ranges, so there is no long design stage between deciding and installing. Once the survey has confirmed the position, surface and power and you have placed your order, the barrier is supplied and installed within 7 days.
- 01
Survey & confirm
We check the barrier position, the surface, the power supply and how the entrance is used, then confirm the specification and the figure. - 02
Groundwork
Where the surface cannot carry the barrier, a concrete base is formed and ducting laid for power and control cables. Additional groundwork is priced at survey. - 03
Installation
The cabinet is fixed to its base, the arm fitted and balanced, and controls and safety detection installed and wired. - 04
Commissioning & handover
Every function and safety device is tested on site. We demonstrate the barrier and its controls before we leave, and can keep it that way with planned servicing.
What we need from you
- A position. Where the cabinet will stand and which side of the crossing it sits on. We will advise at survey if another position works better.
- Power. A mains supply at or near the barrier position. If there is none, tell us when you enquire and it is covered in the survey.
- The surface. What the crossing is made of — tarmac, concrete, block paving — so we know whether a foundation is needed and how detection will be fitted.
- Access on the day. A clear working area around the barrier position while we install, and a way to keep traffic moving around it.

Installation questions
How quickly can a barrier be installed?
Installation within 7 days of placing your order. You place your order by accepting the written quotation that follows the site survey.
Can I buy the barrier and fit it myself?
No. Every barrier we supply is professionally installed and commissioned by our team — installation is part of every order.
Do you install nationwide?
Yes. Barriers are supplied and installed across the United Kingdom, to the same specification wherever the entrance is.
What groundwork does an automatic barrier need?
The cabinet needs a solid concrete base, and power and control cables need ducting to reach it. Where a detection loop is fitted, it is set into the surface under the arm. A concrete barrier foundation is chosen as an option where the position needs one; anything beyond that — breaking out a surface, longer cable runs — is priced at survey before work starts.
Will the entrance be closed while you install?
The working area around the barrier position needs to be kept clear, but in most cases traffic can continue to use the rest of the entrance. We agree how this will work at survey.
What happens at handover?
Once every function and safety device has been tested, we demonstrate the barrier and its controls to whoever will be responsible for it on site.

Tell us about the entrance.We will confirm the installation date.
Choose your barrier and options, add the site details, and we will confirm the specification, the price and the date.

